Not verifying that a rooftop unit curb is level and flashed before setting the unit

4th YearInstallation

Before the crane sets any rooftop unit, physically verify that the curb is level in both directions and that the roof flashing is complete. Setting a unit…

Search Field RescueAsk ForemanOpen in mistake guide

Safer field move

Before the crane sets any rooftop unit, physically verify that the curb is level in both directions and that the roof flashing is complete. Setting a unit on an unlevel curb stresses the cabinet, misaligns the drain pan, and voids the warranty.

Ask Foreman

Can you verify this before I keep going? I’m looking at: Not verifying that a rooftop unit curb is level and flashed before setting the unit. What’s the approved correction for this job?

Do not

Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.