Mistake & recovery · #163

Not confirming that duct seismic bracing is installed per the structural engineer's stamped details

4th YearInstallation

Compare every seismic brace installation to the stamped structural detail before concealing. Spacing, angle, anchor type, and connection method must all m…

Search Field RescueAsk ForemanOpen in mistake guide

Safer field move

Compare every seismic brace installation to the stamped structural detail before concealing. Spacing, angle, anchor type, and connection method must all match the detail exactly. AHJs inspect seismic bracing — non-conforming bracing fails inspection.

Ask Foreman

Can you verify this before I keep going? I’m looking at: Not confirming that duct seismic bracing is installed per the structural engineer's stamped details. What’s the approved correction for this job?

Do not

Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.