Hanging a coil section without checking drain pan tilt toward the drain connection

3rd YearInstallation

The drain pan must slope toward the drain connection — minimum 1/8" per foot. A flat or incorrectly pitched pan holds standing water, breeds bacteria, and…

Search Field RescueAsk ForemanOpen in mistake guide

Safer field move

The drain pan must slope toward the drain connection — minimum 1/8" per foot. A flat or incorrectly pitched pan holds standing water, breeds bacteria, and overflows onto the ceiling below. Verify pitch with a level before securing.

Ask Foreman

Can you verify this before I keep going? I’m looking at: Hanging a coil section without checking drain pan tilt toward the drain connection. What’s the approved correction for this job?

Do not

Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.

Related mistakes