TinnerFlow logoTinnerFlow™
Mistake & recovery · #161

Not establishing a proper rigging plan reviewed by a foreman before setting a large RTU

4th YearInstallation

A written rigging plan for any lift over 1,000 lbs or any lift over a public area is mandatory. The plan must include equipment weight and center of gravi…

Search Field RescueAsk ForemanOpen in mistake guide

Safer field move

A written rigging plan for any lift over 1,000 lbs or any lift over a public area is mandatory. The plan must include equipment weight and center of gravity, crane capacity, rigging configuration, and communication protocol. Have the foreman sign it before the crane arrives.

Ask Foreman

Can you verify this before I keep going? I’m looking at: Not establishing a proper rigging plan reviewed by a foreman before setting a large RTU. What’s the approved correction for this job?

Do not

Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.

Related mistakes

Related apprentice questions