Notching Duct for Structural Conflicts

Sometimes duct must be notched for beams. Notching weakens duct and may need reinforcement.

Red / Stop And Verify3rd yearBatch 2

What You Might Be Looking At

duct section with notch cut to clear beam or structural element

Apprentice words: cutting duct for beam, notch in duct, duct around structure, field cut

Trade terms: duct notch, field notch, structural clearance, duct modification

Check First

Notch depth relative to duct height?
SMACNA allows this size without reinforcement?
Engineer-approved detail?

What Not To Do

Do not notch structural members. Do not notch or field-cut duct for a beam conflict without approved direction. Do not treat a conflict as a fabrication problem until drawings/details are checked.

What can go wrong: Duct collapse, pressure test failure, structural compromise, inspector rejection, re-work

Better Foreman Question

Maximum notch allowed without reinforcement? Engineer-approved detail if it exceeds that?

Open In Ask Foreman

Verify With

Reference type: SMACNA, engineered detail

Source to verify: SMACNA HVAC Duct Construction Standards, project structural details

Safe wording: This is a coordination hold point. Structure and rated assemblies are not field-choice items.