Field changes must be documented on as-built drawings for future maintenance.
What You Might Be Looking At
drawings with red pen or digital markup showing actual installed conditions vs original design
Apprentice words: redline drawings, as-builts, field changes, mark up the prints
Trade terms: as-built drawings, record drawings, redline drawings, construction changes
Check First
What Not To Do
Don't make field changes without marking up drawings. Don't assume someone else will document.
What can go wrong: Future maintenance can't locate devices, warranty issues, disputes over what was installed
Better Foreman Question
For this field modification, should I mark it on the as-built set immediately? And who needs to review the as-builts before closeout?
Verify With
Reference type: project specs
Source to verify: Project specification Section 01 78 00, contract closeout requirements
Safe wording: As-built documentation requirements vary by project.