Not adjusting layout for building out-of-square conditions
3rd YearMeasuring & Layout
Check building squareness by measuring diagonals on the floor before committing any duct layout. If the building is racked, establish your own control gri…
TinnerFlow™3rd YearMeasuring & Layout
Check building squareness by measuring diagonals on the floor before committing any duct layout. If the building is racked, establish your own control gri…
Check building squareness by measuring diagonals on the floor before committing any duct layout. If the building is racked, establish your own control grid based on the mechanical room or main distribution point, not on walls.
Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.