Failing to mark up as-built changes on the job drawings
2nd YearCoordination & Professionalism
Any time a field deviation occurs — duct rerouted, fitting substituted, elevation changed — mark it on the red-line set immediately. As-builts that don't…
TinnerFlow™2nd YearCoordination & Professionalism
Any time a field deviation occurs — duct rerouted, fitting substituted, elevation changed — mark it on the red-line set immediately. As-builts that don't…
Any time a field deviation occurs — duct rerouted, fitting substituted, elevation changed — mark it on the red-line set immediately. As-builts that don't reflect reality cause commissioning failures and expensive investigations.
Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.