Protect Equipment Service Clearance Before Duct Is Final

Equipment Connections: RTU, AHU, VAV, Fans & LouversVERIFYField judgment

Core Answer

Check panel swing, filter pull, coil pull, actuator removal, motor access, and working space before the duct and supports become permanent.

Open in Field RescueOpen Category

What to Check First

Ask Foreman

Before I finalize this duct, can we verify the service-clearance envelope and removal path for the panels, filters, coil, and motor?

Text to Foreman

Do Not Do This

Do not use leftover space as the clearance plan or assume a panel only needs enough room to crack open.

Why This Matters

A connection that fits today can force major demolition during startup or the first repair.

Verify against: equipment manufacturer instructions/submittal, coordinated drawings, foreman direction.