TinnerFlow logoTinnerFlow™
Content Gap Batch 8

Large Duct Gap Needs a Mechanical Fix or Approved Reinforcement

Sealing, Leakage, Mastic & Pressure Testing⚠️ VERIFYField workflow

Core Answer

A wide or moving gap is not automatically a “more mastic” problem. Confirm whether the joint needs to be re-fit, fastened, patched, or reinforced before sealing.

Open in Field RescueOpen Category

What to Check First

Ask Foreman

This gap is about [size] at [location] and the metal [moves/does not move]. Do you want it mechanically corrected or patched before we use the approved mesh-and-sealant system?

Text to Foreman

Do Not Do This

Do not bridge a structural or moving gap with a thick glob of sealant and call it finished.

Why This Matters

Sealant can crack, sag, or separate when it is being asked to hold a bad joint together.

Verify against: approved sealant manufacturer data, project seal class/spec, foreman direction.