TinnerFlow logoTinnerFlow™
Seismic Bracing, Sway Control & Structural Coordination

When Seismic Bracing Is Required

Missing bracing where required; inspection/life-safety fail

Red / Stop And Verify3rdBatch 4

What This Helps With

Missing bracing where required; inspection/life-safety fail

Apprentice words: seismic bracing

Trade terms: seismic bracing, SDC, restraint, bracing plan

Check First

Seismic drawings/spec and where bracing is required

What Not To Do

Decide bracing scope yourself

What can go wrong: Assuming no bracing needed

Better Foreman Question

Does this run need seismic bracing per the seismic plan?

Open In Ask Foreman

Verify With

Reference type: engineered detail

Source to verify: Seismic drawings; OSHPD/AHJ; engineer; spec

Safe wording: RED ZONE. Bracing scope/detail is engineered — verify.

Search Related Field ChecksOpen Field ReferencesAsk Foreman