Commissioning Deficiency: Record the Condition, Owner, and Next Step

Inspection, TAB, Startup, Punch & CloseoutPROCEED WITH CHECKSField judgment

Core Answer

Document the exact condition, location, drawing or equipment reference, responsible party, temporary status, and required verification before closing the item.

Open in Field RescueOpen Category

What to Check First

Ask Foreman

For this commissioning item, who owns the correction and what proof is required before we close it?

Do Not Do This

Do not write vague notes like “HVAC issue,” assign blame without facts, or close an item without verification.

Why This Matters

Clear deficiency records prevent repeated walks, lost responsibility, and false closeout.

Verify against: project commissioning plan, deficiency log procedure, approved drawings and submittals.