Foreman script

Stop and ask

Stop. Get direction before you touch it.

Not cutting flex to proper length before connecting

Boss, I'm at this flex run. I'm seeing not cutting flex to proper length before connecting. Do you want me to document it before we continue?

Boss, I'm at this flex run. I checked the field condition and this may affect access, coordination, TAB, equipment, or the next trade. I'm seeing not cutting flex to proper length before connecting. Do you want this held, documented, or coordinated before we keep going?

Joints, TDC, Flanges & Connections 3rd Year RED

Stop if

Watch out

Check

Say this to your foreman

651 not cutting flex to proper length before connecting hangers / supports red 3 boss, i'm at this flex run. i'm seeing not cutting flex to proper length before connecting. do you want me to document it before we continue? boss, i'm at this flex run. i checked the field condition and this may affect access, coordination, tab, equipment, or the next trade. i'm seeing not cutting flex to proper length before connecting. do you want this held, documented, or coordinated before we keep going? coordination/system issue: not cutting flex to proper length before connecting. i have photos, location, and what is blocked or affected.

More in Joints, TDC, Flanges & Connections