Foreman script

Verify first

Verify before you commit. Cheap to catch now.

Not checking airflow direction/damper position before f

Boss, I'm at this flex run. This is red-zone: not checking airflow direction/damper position before f. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this flex run. This involves not checking airflow direction/damper position before f. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Joints, TDC, Flanges & Connections 4th Year YELLOW

Stop if

Watch out

Check

Say this to your foreman

167 not checking airflow direction/damper position before f hangers / supports yellow 4 boss, i'm at this flex run. this is red-zone: not checking airflow direction/damper position before f. do you want me to hold it until the approved detail is verified? boss, i'm at this flex run. this involves not checking airflow direction/damper position before f. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: not checking airflow direction/damper position before f. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Joints, TDC, Flanges & Connections