Field problem

Verify first

Verify before you commit. Cheap to catch now.

Flex run too long for intended use

If the flex run is too long for the intended use, stop and ask whether the hard duct route should be extended.

Joints, TDC, Flanges & Connections 2nd Year YELLOW

Stop if

Watch out

Check

Steps

Say this to your foreman

This flex run is longer than intended. Do you want hard duct extended or a shorter route?

More in Joints, TDC, Flanges & Connections