Foreman script

Verify first

Verify before you commit. Cheap to catch now.

Excess flex length stuffed above ceiling

Boss, I'm at this flex run. I'm seeing excess flex length stuffed above ceiling. Do you want me to document it before we continue?

Boss, I'm at this flex run. I checked the field condition and this may affect access, coordination, TAB, equipment, or the next trade. I'm seeing excess flex length stuffed above ceiling. Do you want this held, documented, or coordinated before we keep going?

Joints, TDC, Flanges & Connections 3rd Year YELLOW

Stop if

Watch out

Check

Say this to your foreman

155 excess flex length stuffed above ceiling hangers / supports yellow 3 boss, i'm at this flex run. i'm seeing excess flex length stuffed above ceiling. do you want me to document it before we continue? boss, i'm at this flex run. i checked the field condition and this may affect access, coordination, tab, equipment, or the next trade. i'm seeing excess flex length stuffed above ceiling. do you want this held, documented, or coordinated before we keep going? coordination/system issue: excess flex length stuffed above ceiling. i have photos, location, and what is blocked or affected.

More in Joints, TDC, Flanges & Connections