Field problem

Verify first

Verify before you commit. Cheap to catch now.

Before fastening duct to equipment cabinet

Confirm the manufacturer/project connection point before drilling or fastening to an equipment cabinet. Watch for coils, controls, wiring, drain pans, access doors, filters, and service space.

Joints, TDC, Flanges & Connections 2nd Year YELLOW

Stop if

Watch out

Check

Steps

Say this to your foreman

Before I fasten duct to this cabinet, can you verify this is the approved connection point and fastener depth?

More in Joints, TDC, Flanges & Connections