Controls integration requires documentation of what was installed.
Stop if
- For the BAS handoff, what documentation does controls contractor need? Should I label wires and device locations as I install?
Watch out
- Don't install controls without documenting. Don't assume controls contractor knows what you installed. Don't remove labels or tags.
Check
- Is there a controls device schedule?
- Are device locations marked on as-builts?
- Is wiring labeled at both ends?
Steps
- Is there a controls device schedule?
- Are device locations marked on as-builts?
- Is wiring labeled at both ends?
Say this to your foreman
For the BAS handoff, what documentation does controls contractor need? Should I label wires and device locations as I install?