Foreman script
Verify first
Verify before you commit. Cheap to catch now.
The riser joint fits, but the shaft-side corner and cleat cannot be reached after the section lands. I checked access from both floors. Do you want the joint orientation or installation sequence changed before we set it?
backside riser flange hardware cannot be reached backside flange inaccessible shaft riser corner bolt cleat cannot reach stop before closing the shaft-side joint. verify access to every required corner, cleat, bolt, gasket edge, seal point, and inspection surface while the section can still be positioned. the riser joint fits, but the shaft-side corner and cleat cannot be reached after the section lands. i checked access from both floors. do you want the joint orientation or installation sequence changed before we set it?