Apprentice answerHow do I ensure fire-stopping is done correctly around duct penetrating a floor slab
3rd YearRound, Spiral & Flat Oval DuctStop / Verify
Clean all debris out of the open annular air gap between the duct wall and the concrete cutout floor line.
Ask a jobsite questionBack to Round, Spiral & Flat Oval Duct
Plain-English answer
Clean all debris out of the open annular air gap between the duct wall and the concrete cutout floor line.
Pack the space tightly with an approved dense mineral wool insulation batting (backing material), leaving a uniform 1-inch deep pocket at the top. Fill this top pocket completely with a thick, smooth layer of UL-classified intumescent fire-stop caulk or fire-rated mortar sealant until it is completely smoke-tight.
Field checklist
- Stop and verify the approved detail, manufacturer instructions, foreman direction, and project specs before touching it.
- Clean all debris out of the open annular air gap between the duct wall and the concrete cutout floor line.
- Pack the space tightly with an approved dense mineral wool insulation batting (backing material), leaving a uniform 1-inch deep pocket at the top. Fill this top pocket completely with...
Ask Foreman
Hey boss, I’m on sealing & insulation and need verification before I touch this: How do I ensure fire-stopping is done correctly around duct penetrating a floor slab? Do you want me to stop here and check the approved detail, submittal, or inspector/manufacturer requirement first?
Verify before acting
Use this as training guidance. The foreman, approved drawings, project specs, manufacturer installation instructions, employer safety policy, and AHJ/code requirements always control the final answer.
Related questions in this category