Keep the protective plastic shipping wrap caps sealed over all open end sections of the hung duct runs to stop construction dust and trash from gathering inside.

Search Field RescueOpen in Q&A search

Plain-English answer

Keep the protective plastic shipping wrap caps sealed over all open end sections of the hung duct runs to stop construction dust and trash from gathering inside.

Tie high-visibility safety flagging tape loosely around the bottom profiles of low-hanging duct sections in high-traffic hallways to alert lift operators, and inform the GC superintendent if other crews are leaning heavy equipment or ladders against your finished duct lines.

Field checklist

Ask Foreman

Hey boss, I’m checking trade coordination: How do I protect my installed ductwork from getting damaged by other trades on lifts? I found the likely issue and want to verify the next step before I lock it in. Do you want me to adjust it now or check the drawing/detail first?

Open Ask Foreman

Verify before acting

Use this as training guidance. The foreman, approved drawings, project specs, manufacturer installation instructions, employer safety policy, and AHJ/code requirements always control the final answer.