Not cross-checking duct elevations against the structural and plumbing BIM model

4th YearMeasuring & Layout

Run a BIM clash detection report before fabricating any duct package in a congested area. Unresolved clashes discovered during installation cost far more…

Search Field RescueAsk ForemanOpen in mistake guide

Safer field move

Run a BIM clash detection report before fabricating any duct package in a congested area. Unresolved clashes discovered during installation cost far more to fix than they would have in the model.

Ask Foreman

Can you verify this before I keep going? I’m looking at: Not cross-checking duct elevations against the structural and plumbing BIM model. What’s the approved correction for this job?

Do not

Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.