Failing to verify that shop drawings match the approved submittal before fabricating a full run

4th YearMeasuring & Layout

Pull the approved submittal and compare it to the shop drawing for every prefab package before production starts. Un-approved revisions in the shop drawin…

Search Field RescueAsk ForemanOpen in mistake guide

Safer field move

Pull the approved submittal and compare it to the shop drawing for every prefab package before production starts. Un-approved revisions in the shop drawing that don't match the submittal will fail inspection and require replacement.

Ask Foreman

Can you verify this before I keep going? I’m looking at: Failing to verify that shop drawings match the approved submittal before fabricating a full run. What’s the approved correction for this job?

Do not

Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.