Mistake & recovery · #113

Applying insulation board to duct without staggering the seams

3rd YearSheet Metal Work

Stagger end joints a minimum of 24" and face joints 12" between adjacent boards. Aligned seams create a thermal and air leakage path. Use the correct adhe…

Search Field RescueAsk ForemanOpen in mistake guide

Safer field move

Stagger end joints a minimum of 24" and face joints 12" between adjacent boards. Aligned seams create a thermal and air leakage path. Use the correct adhesive and mechanical fasteners per the specification.

Ask Foreman

Can you verify this before I keep going? I’m looking at: Applying insulation board to duct without staggering the seams. What’s the approved correction for this job?

Do not

Do not hide, force, cover, or “make it work” if this affects safety, access, airflow, rated assemblies, supports, equipment, or inspection. Stop and verify the approved correction.