What should an apprentice know before a crane pick or lift day starts?

Seismic Bracing, Sway Control & Structural CoordinationHigh-risk starter answer — foreman/qualified-person verification required

Lift day is awareness-only unless you are assigned and qualified. Before the pick starts, know where apprentices stand, who signals, where the fall zone is, and what your exact role is.

Open in Field RescueOpen category

Field checklist

Ask foreman

Before the pick starts, who is the signal person and where do you want apprentices standing? I want to stay clear unless I’m assigned a specific task.

Do not

Do not stand under the load, signal the crane, choose rigging, or touch slings/shackles/hooks unless assigned and qualified.

Why it matters

The first apprentice lift-day question is not how to rig. It is where to stand and who is in charge.

Search words: apprentice commercial crane crane pick day fall fall zone foreman install lift lift day path pick project qualified qualified rigger rigger swing swing path tagline verify zone crane pick lift day before crane pick suspended load fall zone swing path tag line tagline crane pick crane pick lift day crane pick where to stand diagonal brace seismic symbol moved brace corrosion pitting rust fire damper screw in damper breakaway access painted shut actuator wiring inspection correction