Measure the duct plus required insulation thickness.
Check clearance to ceiling grid, walls, lights, access panels, and other trades.
Confirm whether insulation will be external wrap, internal liner, or another system.
Flag any area where insulation will make access impossible.
Ask foreman
With the insulation thickness added, this clearance gets tight at [location]. Do you want this rerouted or verified before wrap?
Do not
Do not approve a tight route based on bare-metal duct only.
Why it matters
Insulation affects access, vapor barrier, condensation control, inspections, TAB/service access, and finished-work quality. Project specs and manufacturer details still control.
Search words: insulation liner vapor barrier clearance audit v141 final categories insulation cutting tools first year why year tag search what do i do when wrong insulation thickness not accounted for in clearance?