What do I do when not verifying seismic category/importance factor with foreman?
Seismic Bracing, Sway Control & Structural CoordinationHigh-risk starter answer — foreman/qualified-person verification required
Seismic category and importance factor are design/engineering items. Do not use a low-seismic or wrong-project detail because it looks close.
