TinnerFlow logoTinnerFlow™
Static field route #66

What do I do when not verifying curb/opening size before equipment connection?

Measuring, Field Verification & Layout MarksFoundation layout starter — field verify before cutting/loading

Verify curb/opening size before connecting equipment. Measure the real opening and compare it to the equipment/submittal/detail.

Open in Field RescueOpen category

Field checklist

Ask foreman

Can you verify this curb/opening matches the equipment before we connect?

Do not

Do not connect duct to a curb/opening you have not verified.

Why it matters

Equipment openings are expensive places to discover the measurement was wrong.

Search words: measure layout verify equipment verify curb opening equipment connection verify RTU curb opening equipment connection verify RTU foundation field