TinnerFlow logoTinnerFlow™
Static field route #56

What do I do when not snapping/chalking straight hanger lines?

Measuring, Field Verification & Layout MarksFoundation layout starter — field verify before cutting/loading

Snap or mark a straight hanger line from verified control points before drilling or loading duct.

Open in Field RescueOpen category

Field checklist

Ask foreman

Can you verify this hanger line before I drill/load the run?

Do not

Do not eyeball a hanger line across a long run.

Why it matters

Crooked layout becomes crooked duct, bad spacing, and harder install.

Search words: measure layout verify hanger layout hanger line chalk snap layout straight hanger line chalk snap layout straight foundation field duct not level crooked duct hanger line straight chalk snap laser alignment