TinnerFlow logoTinnerFlow™
Static field route #218

What do I do when not marking seismic locations for inspection?

Seismic Bracing, Sway Control & Structural CoordinationHigh-risk starter answer — foreman/qualified-person verification required

Before seismic inspection, make brace locations visible, labeled/locatable, and photo-documented. Do not let inspection items disappear behind ceiling or insulation.

Open in Field RescueOpen category

Field checklist

Ask foreman

Seismic inspection is coming. Do you want me to run a brace-location walk and send photos/punch items before the inspector arrives?

Do not

Do not modify or copy bracing/rigging from another area just because it looks similar.

Why it matters

Seismic inspection fails are often visibility/documentation failures, not just installation failures.

Search words: seismic bracing structural inspection lift day crane pick where to stand diagonal brace seismic symbol moved brace corrosion pitting rust fire damper screw in damper breakaway access painted shut actuator wiring inspection correction