What do I do when not checking VAV box flow arrow?

Equipment Connections: RTU, AHU, VAV, Fans & Louvers.1 field-polished — equipment/submittal check

Follow the equipment/submittal/manufacturer connection requirement: not checking VAV box flow arrow.

Open in Field RescueOpen category

Field checklist

Ask foreman

In Equipment Connections: RTU, AHU, VAV, Fans & Louvers, I’m looking at: What do I do when not checking VAV box flow arrow? What should I verify before I cut, drill, seal, cover, move, or install?

Do not

Do not bury the controller, coil, damper, or access side behind duct, flex, insulation, or hangers.

Why it matters

Project drawings/specs, equipment submittals, manufacturer instructions, access/service clearance requirements, foreman direction, startup needs, and approved equipment connection details.

Search words: Equipment Connections: RTU, AHU, VAV, Fans & Louvers not checking VAV box flow arrow