TinnerFlow logoTinnerFlow™
Static field route #61

What do I do when not checking door/elevator/stair access for large duct?

Measuring, Field Verification & Layout MarksFoundation layout starter — field verify before cutting/loading

Verify door, elevator, stair, hallway, roof hatch, and laydown access before ordering or moving large duct.

Open in Field RescueOpen category

Field checklist

Ask foreman

What is the max piece size we can get through this access path?

Do not

Do not order or build duct that cannot physically reach the install area.

Why it matters

Material that cannot get to the work is not installable material.

Search words: measure layout verify material path door elevator stair access large duct delivery door elevator stair access large duct delivery foundation field