TinnerFlow logoTinnerFlow™
Static field route #205

What do I do when missing sway control on long run?

Seismic Bracing, Sway Control & Structural CoordinationHigh-risk starter answer — foreman/qualified-person verification required

Do not move seismic/sway bracing casually: missing sway control on long run.

Open in Field RescueOpen category

Field checklist

Ask foreman

In Seismic Bracing, Sway Control & Structural Coordination, I’m looking at: What do I do when missing sway control on long run? What should I verify before I cut, drill, seal, cover, move, or install?

Do not

Do not modify or copy bracing/rigging from another area just because it looks similar.

Why it matters

OSHA 1926.1425 keeping clear of load; OSHA 1926.1428 signal person qualifications; OSHA 1926.251 rigging equipment; SMACNA/project bracing details where applicable

Search words: seismic bracing structural sway