Insulation, Liner, Vapor Barrier & Condensation.1 field-polished — insulation/rated-detail check

Do not insulate before pressure testing or leakage checks when the job requires testing. Covering early makes leaks harder to find and fix.

Open in Field RescueOpen category

Field checklist

Ask foreman

Is this section cleared for insulation, or does it need pressure/leakage testing first?

Do not

Do not wrap over joints that still need to be tested.

Why it matters

Insulation affects access, vapor barrier, condensation control, inspections, TAB/service access, and finished-work quality. Project specs and manufacturer details still control.