Check whether sealing, pressure testing, or inspection is complete.
Look at backside joints, corners, collars, taps, and seams.
Photograph hard-to-see areas before cover if directed.
Hold insulation until the foreman says the duct is ready.
Ask foreman
Before I insulate this run, has sealing/testing/inspection been cleared for these joints?
Do not
Do not use insulation to hide an unverified joint.
Why it matters
Insulation affects access, vapor barrier, condensation control, inspections, TAB/service access, and finished-work quality. Project specs and manufacturer details still control.
Search words: insulation liner vapor barrier sequence audit v141 final categories insulation cutting tools first year why year tag search what do i do when insulation installed before joint inspection?