TinnerFlow logoTinnerFlow™
Static field route #29

What do I do when installing from architectural ceiling plan instead of mechanical plan?

Print Reading, Tags & LayoutFoundation print-reading starter — verify latest revision/detail

Use the mechanical plan for duct routing, not the architectural ceiling plan alone. Ceiling plans help coordinate openings, not define duct install by themselves.

Open in Field RescueOpen category

Field checklist

Ask foreman

Mechanical and architectural sheets disagree here. Which one controls this duct route?

Do not

Do not install duct from the ceiling plan alone.

Why it matters

Architectural drawings show finishes; mechanical drawings show the duct intent.

Search words: prints layout tags drawing discipline architectural ceiling plan mechanical plan RCP coordination architectural ceiling plan mechanical plan RCP coordination foundation field