Verify attachment point, brace direction, hardware, and angle against the detail.
Ask for the missing detail sheet if it is not in your set.
Ask foreman
In Seismic Bracing, Sway Control & Structural Coordination, I’m looking at: What do I do when installing brace without approved detail? What should I verify before I cut, drill, seal, cover, move, or install?
Do not
Do not modify or copy bracing/rigging from another area just because it looks similar.
Why it matters
Seismic bracing depends on project-specific load path, structure, hardware, and inspection requirements.
Search words: seismic bracing structural approved detail lift day crane pick where to stand diagonal brace seismic symbol moved brace corrosion pitting rust fire damper screw in damper breakaway access painted shut actuator wiring inspection correction