What do I do when forgetting slope/drainage needs on special exhaust?
Measuring, Field Verification & Layout MarksFoundation layout starter — field verify before cutting/loading
For special exhaust or drainage-sensitive runs, verify slope/drainage before layout. Do not assume level duct is acceptable.
