What do I do when equipment connection installed before curb/unit verified?

Equipment Connections: RTU, AHU, VAV, Fans & Louvers.1 field-polished — equipment/submittal check

Follow the equipment/submittal/manufacturer connection requirement: equipment connection installed before curb/unit verified.

Open in Field RescueOpen category

Field checklist

Ask foreman

In Equipment Connections: RTU, AHU, VAV, Fans & Louvers, I’m looking at: What do I do when equipment connection installed before curb/unit verified? What should I verify before I cut, drill, seal, cover, move, or install?

Do not

Do not assume the curb is right just because it is installed, and do not field-adapt the opening without approval.

Why it matters

Project drawings/specs, equipment submittals, manufacturer instructions, access/service clearance requirements, foreman direction, startup needs, and approved equipment connection details.

Search words: equipment connections sequence