What do I do when duct run installed before equipment final location?

Coordination, Clashes, Sequencing & ReworkCoordination starter — document before changing work

If a foreman’s direction appears to conflict with submittal, tag, or final equipment location, bring the specific evidence calmly before final-connecting.

Open in Field RescueOpen category

Field checklist

Ask foreman

I want to connect this, but the submittal/tag looks about [distance] different from the field location. Can we verify before I seal/final-connect?

Do not

Do not final-connect a questionable equipment location just to avoid a hard conversation.

Why it matters

Professional pushback protects the crew when downstream duct depends on the equipment being right.

Search words: coordination clashes rework equipment coordination equipment final location duct connection RTU AHU fan equipment final location duct connection RTU AHU fan coordination rework What do I do when duct run installed before equipment final location? If a foreman’s direction appears to conflict with submittal, tag, or final equipment location, bring the specific evidence calmly before final-connecting. coordination clashes rework equipment coordination equipment final location duct connection RTU AHU fan