Identify whether you are looking at a hanger, brace, restraint, anchor, insert, structural member, rigging gear, or crane/lift-day zone.
Confirm the brace lands on an approved structural attachment point before loading it.
Ask foreman
In Seismic Bracing, Sway Control & Structural Coordination, I’m looking at: What do I do when brace anchored to non-structural element? What should I verify before I cut, drill, seal, cover, move, or install?
Do not
Do not modify or copy bracing/rigging from another area just because it looks similar. Do not attach bracing to ceiling grid, wire, pipe, duct, conduit, or another trade’s support unless the approved detail specifically allows it.
Why it matters
OSHA 1926.1425 keeping clear of load; OSHA 1926.1428 signal person qualifications; OSHA 1926.251 rigging equipment; SMACNA/project bracing details where applicable
Search words: seismic bracing structural anchor point