What do I do when brace anchored to non-structural element?

Seismic Bracing, Sway Control & Structural CoordinationHigh-risk starter answer — foreman/qualified-person verification required

Do not move seismic/sway bracing casually: brace anchored to non-structural element.

Open in Field RescueOpen category

Field checklist

Ask foreman

In Seismic Bracing, Sway Control & Structural Coordination, I’m looking at: What do I do when brace anchored to non-structural element? What should I verify before I cut, drill, seal, cover, move, or install?

Do not

Do not modify or copy bracing/rigging from another area just because it looks similar. Do not attach bracing to ceiling grid, wire, pipe, duct, conduit, or another trade’s support unless the approved detail specifically allows it.

Why it matters

OSHA 1926.1425 keeping clear of load; OSHA 1926.1428 signal person qualifications; OSHA 1926.251 rigging equipment; SMACNA/project bracing details where applicable

Search words: seismic bracing structural anchor point