Stop and verify the connector callout. Pressure class, duct size, leakage class, and project specs decide the joint system — not what material happens to be nearby.
In Rectangular Duct Assembly: S-and-Drive, I’m looking at: What do I do if I think this duct should be TDC/Ductmate instead of S-and-drive? What should I verify before I cut, drill, seal, cover, move, or install?
Do not
Do not mix connector systems in the field without approval.