Verify piece mark, system, size, airflow direction, and branch/opening direction before locking the joint. Stopping before seal and insulation saves major rework.
In Rectangular Duct Assembly: S-and-Drive, I’m looking at: What do I do before connecting a section that might be facing the wrong way? What should I verify before I cut, drill, seal, cover, move, or install?
Do not
Do not force the duct until it buckles or locks in wrong.