Walk main duct for crushed sections, leakage, disconnected pieces, or wrong size.
Walk branches for closed dampers, bad takeoffs, flex restrictions, and missing seals.
List each issue by room/grid with photo.
Bring a clean punch list to foreman/TAB before retest.
Ask foreman
TAB says this system is short by [amount]. Do you want me to walk equipment, main, branches, dampers, and devices and bring back a punch list?
Do not
Do not wander randomly or blame design before documenting the installed air path.
Why it matters
This route was added from apprentice scenario testing to catch natural field/search language before it becomes a dead end. Verify job-specific authority before acting.
Search words: system short cfm 30 percent low total airflow TAB short airflow investigation system short cfm 30 percent low total airflow TAB short airflow investigation