Seismic inspection is tomorrow — what should I pre-walk?
Seismic Bracing, Sway Control & Structural Coordinationfield-polished — audit route
Walk bracing by room/grid/system before the inspector arrives. Make anchors, clamps, brace direction, tags, structural attachment, and blocked access visible and documented.
