Pool or natatorium equipment exposed to corrosive air
Equipment ConnectionsV139 audit-polished route
In pool/natatorium air, verify the whole material system before connecting equipment or duct: equipment, duct, supports, fasteners, coatings, isolation, and future access all matter.
