I already covered hidden work before it was checked. What now?
QA/QC, Punchlist & Inspection Readinessyellow
Do not pretend it was inspected. Stop, document what got covered, identify whether it affects dampers, access, rated work, sealing, insulation, hangers, or TAB, and ask whether it needs to be reopened.
I realized this area got covered before [access/seal/damper/support/TAB] was verified. Here is the location and what I can still see. Do you want it reopened, documented, or inspected another way?
Do not
Do not sign off hidden work you did not verify. Do not blame another trade before you know the sequence.
Why it matters
Covered work can turn into inspection failure, destructive access, rework, or a contractor dispute. Clean reporting protects the crew.
Search words: already covered covered it already covered before inspection hidden work pre cover missing photos ceiling closed damper access insulation seal support I covered it already already covered covered before checked hidden work covered before verified pre cover mistake ceiling closed recover