Static field route #13905Before fastening duct to equipment cabinetEquipment ConnectionsV139 audit-polished routeConfirm the manufacturer/project connection point before drilling or fastening to an equipment cabinet. Watch for coils, controls, wiring, drain pans, access doors, filters, and service space.Open in Field RescueOpen categoryPrint this route