Missing Piece in the Delivery: Protect the Install Sequence

PROCEED WITH CHECKS

Fast answer

When a fitting or section is missing, identify exactly what is absent and adjust the install sequence without trapping the future replacement or creating unsupported work.

What to check

  1. Confirm the piece mark against the delivery list, spool, and nearby material.
  2. Check whether it was delivered to another floor or zone before reporting it missing.
  3. Mark the open location and required orientation and dimensions.
  4. Plan surrounding work so the replacement still has an insertion path and usable joint access.

Do not

Do not close both sides of the gap or fabricate a guess piece without confirming the current drawing and shop record.

Ask the foreman

“Piece 4B-27 is missing after checking this floor and the delivery list. Can we install past it without trapping the replacement, or do you want this run held?”

Why it matters

A missing fitting is manageable until the crew installs away the space needed to put it in.