Field problem
Verify first
Verify before you commit. Cheap to catch now.
Use the approved corner and flange hardware for that connector system. Get the duct supported, level, square, and aligned first; the hardware holds the joint together-it is not a tool for pulling a crooked run straight.
In Rectangular Duct Assembly: TDC / Ductmate / Flanges, I'm looking at: Wrong fasteners for flange/corner. What should I verify before I cut, drill, seal, cover, move, or install?